VW Connect

1994

VW Dig Was Born

Trenching and installing conduit with 1 backhoe and 1 truck, Stephen Naylor, Founded VW Dig in February 1994.

2002

The Beginning of Early Utility Program

Called the TIPPS Program (temporary in permanent position). Required coordination between home builders, concrete companies, framers, electricians, municipalities, and utility companies.

2003

Tucson Conduit System

2004

Superior Office

Completed the construction of our superior office in Phoenix, Arizona.

2006

Tucson Office

Completed the construction of our office on Station Master Drive in Tucson, Arizona.

2010

Permanent Power Program

The electric companies set a permanent meter. Return trips to the house are no longer needed.

2014

The Beginning of Plumbing Soils

2015

The Beginning of Power Line Installations

2017

The Beginning of Gas Riser Installations

2018

VW Connect Was Formed

VW Dig and Site Utility Systems merged to create VW Connect. The 40th Street office and yard were completed. The land development division was created, focusing on dry utility installations for residential development.

2019

Wally's First Job