VW Connect is in sync with the builder's schedules.
With builders committed to having early utilities, APS looked for solutions to get the power on at the homes earlier. As an approved conduit contractor in Arizona, VW Connect works with builder's to understand their needs.
VW Connect's goal is to install power lines within 2 days of conduit install.
Knowing the complexity of the build cycle and the safety required, VW Connect, worked with APS dramatically shortening the number of days it took to get power lines connected to houses.